How long does a radon mitigation install take?

Direct answer

One working day for most single-suction systems in a basement or slab home. Crawl space membranes and mixed foundations can stretch to two. The verification retest runs at least 48 hours after the fan has been on for a day.

More detail

The calendar around the install day is what homeowners underestimate. Before it: a look at the foundation and a written fixed quote, which can usually happen within a few days of the first call. After it: the fan runs at least 24 hours before the retest starts, and the retest itself needs 48 hours of closed-house conditions, so the full proof takes about four days from the first hole cored. Winter weather rarely interferes, since nearly all the work happens indoors and the exterior portion is a few hours of pipe and wiring. If a closing date or a report date is driving things, say so up front; the whole sequence gets planned backward from it, and the real estate service exists for exactly that squeeze.

Authoritative sources

Ready to get started?

El Paso County homes average 5. Mon-Sat 8am-6pm.

Call (719) 695-7610Text us

Prefer to text? Open your texting app